| |
BERTHS & MOORING DOLPHINS |
|
The
present berthing facilities available at the Port are as follows : |
Berth No. |
|
Height of berth from chart datum(mts.)
|
|
Length (mts.) |
|
Maximum
permissible LOA (mts.) |
|
Draft |
|
Type of cargo
handled |
Fair
Season
(mts.) |
Monsoon season (mts.) |
5A
6A
7
8
9
10
11 |
4.5
4.5
4.2
4.2
4.5
4.5
4.5 |
210
240
100
116
298*
222
357.5*
250
270 |
190
225
100
260
335
225
225 |
12.00
14.00
3.50
12.50
14.00
11.40 12.80 |
11.00
12.00
3.50
11.00
12.00
11.00
12.00 |
Steel products
Bulk Coal
Pellets, coke,etc.
Liquid bulk
Iron ore
General cargo and containers |
| Mooring Dolphins |
No.1(west
side)
No.2(
between 1 &2)
No.3 (between
2 & 3) |
-
-
- |
-
-
- |
851
225
225 |
-
11.00
11.00 |
Iron Ore, Other Ores & other Gen. cargo |
|
*Length between extreme mooring dolphins.
Note: 1. Three new mooring dolphins are being constructed westwards of the
existing Dolphins,
2. Existing mole is being strengthened & modified into a 270m long and
22m wide berth, basically for handling non-cargo vessels.
|
| |
|
|
|